Playbook · NIST SP 800-171 · DCMA DIBCAC
Getting ready for a DIBCAC assessment
A plain-English guide for small defense contractors: what the assessors ask for, how they score you, and how to organize your proof so you can find any document in minutes.
What this is not. Legal advice, or a promise that you will pass. Your contract, your contracting officer, and the assessors have the final word. Source labels: Primary marks DoD or DCMA documents and federal regulation; Secondary marks commentary.
1. The big picture
If your company handles Controlled Unclassified Information (CUI) on a Department of Defense contract, you are expected to follow the 110 security requirements in NIST SP 800-171. Each requirement is split into smaller checkpoints called assessment objectives. DIBCAC's database holds 320 of them, and assessors grade you checkpoint by checkpoint.
DIBCAC is the Defense Industrial Base Cybersecurity Assessment Center, the government's own assessment team inside the Defense Contract Management Agency (DCMA). It does not sell services. It checks whether contractors do what their System Security Plan says they do.
Where things stand in November 2026
- DoD suspended CMMC Phase 2 in July 2026. The memo is effective immediately, and says DoD will enforce baseline compliance "through CMMC Level 1 and CMMC Level 2 self-assessment and select Government-led assessments." Primary
- What paused is the requirement for program offices to designate CMMC Level 2 (C3PAO) assessments, along with CMMC Level 3 (DIBCAC) designations, during a 60-day review. The memo says further guidance will follow that review. Primary
- What did not pause: DFARS 252.204-7012 "remain[s] in effect," so the 110 requirements still apply. Basic self-assessments and SPRS scores still apply, and so do CMMC Level 1 and Level 2 (Self) assessments. Where your contract has DFARS 252.204-7021, you must keep a current CMMC status for the life of the contract and complete an affirmation of continuous compliance in SPRS every year. A Level 2 (Self) status is good for 3 years. Primary That the suspension leaves self-assessments and SPRS scores in place is from a law-firm summary. Secondary
- DFARS 252.204-7020 requires you to give the Government access to your facilities, systems and personnel for a Medium or High assessment. The memo does not mention it. Primary This is separate from CMMC Level 3. The copy of the clause we reviewed (NOV 2023) is filed under a "reserved" parent topic, which fits reports that it was renumbered, so check which clause number your contract cites.
- Our planning assumption: DIBCAC assessments under your contract are not suspended, and C3PAO assessments are likely to return. DoD has not said when. Prepare as if either could be scheduled.
- As of November 4, 2026, we found no announcement ending the suspension. Check the DoD CIO CMMC page for anything newer.
- Practical result: your self-assessment score and your SSP carry more weight, not less. Treat them as if an assessor will read them.
2. Three kinds of assessment
| Level | Who does it | What happens | What it feels like |
|---|---|---|---|
| Basic | You | You score yourself against the 110 requirements and post the score in SPRS. | Homework you grade yourself. |
| Medium | DIBCAC | Assessors review your self-assessment and System Security Plan (SSP) on paper. If the SSP does not clearly show how a requirement is met, it is scored "Not Implemented." | A teacher checking your homework. |
| High | DIBCAC | Everything in Medium, plus artifact requests, interviews with your people, and live demonstrations. A virtual portion, and sometimes an on-site portion. Scheduled Monday to Thursday, with Friday held in reserve. | An open-book exam with a live demonstration. |
DFARS 252.204-7020 defines both as Government assessments. A Medium assessment is a review of your Basic assessment, a thorough document review, and discussions with you. A High assessment adds verification, examination and demonstration of your SSP using NIST SP 800-171A. Primary
The methodology rates the resulting score by confidence: Low for a Basic (self-generated) score, Medium for a Medium assessment, and High for a High assessment. It describes Medium assessments as conducted by trained DoD personnel, often program office staff; DIBCAC's package covers the DIBCAC-run version. Primary
Source: DIBCAC Pre-Assessment Package, Enclosure 1. Primary NIST SP 800-171A is named there as the primary and authoritative guide for assessing the requirements.
3. How scoring works
You start at 110. For each requirement you have not fully met, you subtract its point value. A score below zero is possible and is not unusual for a first honest self-assessment.
| Point value | Requirements | Examples |
|---|---|---|
| 5 points | 44 | Limiting access (3.1.1), multifactor authentication (3.5.3), flaw remediation (3.14.1), baseline configurations (3.4.1) |
| 3 points | 14 | Least privilege (3.1.5), risk assessment (3.11.1), unique user traceability (3.3.2) |
| 1 point | 51 | Session lock (3.1.10), reviewing logged events (3.3.3), testing incident response (3.6.3) |
| 0 points | 1 | System Security Plan (3.12.4) |
Floor: 44×5 + 14×3 + 51×1 = 313 points, so the lowest score is 110 − 313 = −203.
The SSP (3.12.4) carries no points, but without it there is nothing to score. The methodology says the absence of an SSP results in a finding that "an assessment could not be completed due to incomplete information and noncompliance with DFARS clause 252.204-7012." Primary
Partial credit and "does not apply" rules
Source: DoD Assessment Methodology v1.2.1 (June 24, 2020) and DIBCAC's self-assessment database. Scoring is the same for Basic, Medium and High assessments. Primary
| Requirement | Rule written into DIBCAC's database |
|---|---|
| 3.5.3 Multifactor authentication | Subtract 5 if MFA is not implemented for any users. Subtract 3 if MFA is implemented only for remote and privileged users and not yet for general users. Primary |
| 3.13.11 FIPS-validated cryptography | Subtract 5 if no cryptography is employed. Subtract 3 if it is employed but not FIPS-validated. The cryptographic module must be validated under FIPS 140; using an approved algorithm such as AES is not enough. Isolated non-validated use with a plan of action is treated as a temporary deficiency and scored as implemented. Primary |
| 3.1.12, 3.1.13 Remote access | No deduction if remote access is not permitted. |
| 3.1.16, 3.1.17 Wireless | No deduction if wireless access is not permitted. |
| 3.1.18 Mobile devices | No deduction if connection of mobile devices is not permitted. The methodology adds that a company that disallows remote, wireless or mobile access should also have a policy and procedure ensuring those capabilities are not enabled inadvertently. Without one, a point can be assessed. |
Four rules that surprise people
- A plan of action earns no credit. A requirement that is not fully implemented is scored "not implemented," whether or not a plan exists. The methodology's own example is an MFA rollout that is 75% complete: 3.5.3 is still "not implemented."
- No plan of action, no 3.12.2. Missing plans of action for unimplemented requirements make 3.12.2 itself "not implemented."
- Temporary deficiencies can still score as implemented. If a plan of action has milestones and shows progress, for example a patch that broke a FIPS validation or a rollout held up by unexpected hardware issues, the requirement can be scored as implemented. There is no standard duration; it is "what is reasonable."
- Isolated enduring exceptions can too. Unique equipment, such as specialized manufacturing gear or a laboratory, that cannot meet a requirement is assessed as implemented when the exception and its mitigations are described in the SSP.
Source: DoD Assessment Methodology v1.2.1, sections 5(g) and 5(h). Primary
Takeaway. A 5-point requirement you skip costs as much as five 1-point requirements. Fix the 5-pointers first. The appendix lets you mark requirements as not met and see the resulting score.
4. The four kinds of proof
For each of the 320 checkpoints, DIBCAC's database records the kind of proof assessors expect to see.
| Proof type | What it means for you | Everyday examples |
|---|---|---|
| Document | Something written down and approved. | Policies, procedures, the SSP, a network diagram, a list of authorized users |
| Artifact | A record showing the thing actually happened. | Training sign-in sheets, access-review records, scan reports, patch tickets, log-review notes, an incident-response exercise write-up |
| Screen Share | Show it live on screen. | Logging in with MFA, a locked-down account, a firewall rule, an encryption setting |
| Physical Review | The assessor sees it in person. | Locked doors, visitor log, escorted visitors, secured storage, media markings |
| Artifact + Screen Share | Both. This is 3.13.11, FIPS-validated cryptography. | The validation certificate and the setting turned on |
Counts come from the "Standard" column of DIBCAC's Public 800-171 Self-Assessment Database v1.1. The database does not define the terms; the examples are ours.
A binder of policies is the starting line
Only 7 of the 110 requirements can be satisfied by paperwork alone: 3.1.21, 3.5.1, 3.5.9, 3.6.1, 3.7.6, 3.8.3, and the SSP itself (3.12.4). For the other 103, at least one checkpoint needs a record, a live demonstration, or an in-person look.
What makes your proof acceptable
- Explain how you do it; do not copy the requirement. Pasting the NIST wording into the SSP is called out as not acceptable. Say how, with what, and who does it. Primary
- Connect each tool or policy to the requirement. "We use Microsoft 365" is not an answer. "MFA is enforced for all users through Conditional Access policy X" is. Primary
- Have everything the SSP mentions ready. Supporting documentation referenced in the SSP should be available to the assessment team. Primary
- Send the current, final SSP and keep a revision history for the SSP and key artifacts. Primary
- Keep artifacts unaltered. Be able to show a file is the same as when the assessor reviewed it (see section 8). Primary
5. What DIBCAC will ask you for
For both Medium and High assessments
What Enclosure 2 contains
Tables 1 and 3–4
- SSP name and version, Basic score, assessment date, and the date you expect 110. All must match SPRS.
- Three high-priority contracts (preferably active) containing DFARS 252.204-7012, and 252.204-7020 if applicable. Say whether each contains CUI.
- Every CAGE code your company has, whether or not DCMA administers it, and whether each is covered by the enterprise SSP.
Table 2: ten yes / no / N/A attestations
Each one initialed by the company official.
- 7012(b)(2)(ii)(D): external cloud service requirements
- 7012(c): cyber incident reporting
- 7012(d): malicious software
- 7012(e): media preservation and protection
- 7012(f): access to additional information or equipment
- 7012(g): cyber incident damage assessment
- 7012(h): safeguarding contractor attributional or proprietary information
- 7012(m)(1): flow-down clause in subcontracts
- 7012(m)(1): CUI determination in subcontracts by the prime
- 7012(m)(2): notification and incident report requirement
The signature states that the listed CAGE codes are covered by the named SSP and are in scope. The sheet warns that re-assessment may be required if changes are requested after the assessment.
Additional items for a High assessment
If you are a subcontractor, or you hire them
- DFARS 252.204-7020 must be flowed down in all subcontracts, including for commercial products and services, except commercially available off-the-shelf items.
- A prime may not award a subcontract subject to 252.204-7012 unless the subcontractor has completed at least a Basic assessment within the last 3 years. A posted score older than 3 years does not count unless the solicitation sets a shorter period.
- SPRS holds the summary score, such as 105 of 110, not the score for each requirement. DoD keeps any extra High-assessment documentation as CUI for internal use.
Source: DFARS 252.204-7020 (NOV 2023), paragraphs (d), (f) and (g). Primary
Small-business reality check. DIBCAC's list was written for companies of every size. In a ten-person shop, one person may be the network administrator, the account manager, and the incident responder. That is fine, as long as that person can explain and demonstrate each area.
6. Timeline
| When | What happens | Your job |
|---|---|---|
| 5 weeks before | Pre-assessment coordination call | Have your self-assessment score, SSP, and Enclosure 2 ready |
| 14 days before | DIBCAC sends a DoD SAFE drop request | Gather your files |
| 7 days before | Materials received by DCMA | Upload, encrypted |
| By the last day | DCMA out-brief | Listen and take notes |
| 14 business days after | Reclama period ends | Submit corrections or added evidence if you disagree with a finding. DFARS 252.204-7020(e)(2) gives you 14 business days to rebut. |
| Within 60 days after a High | Results provided to the company | Update SPRS and your plans of action |
DIBCAC publishes this as a tentative schedule. Primary Candidate C3PAOs follow a different track: a scoping call about eight weeks out, SAFE uploads two weeks before the scoping call and before the start, and an agreed assessment plan at least three days ahead.
A High assessment week
Monday
In-brief, then assessors read your SSP and documents.
4:00–4:30 pm: artifact requests and hot wash.
Tuesday
Room 1: 3.1 Access Control, 3.3 Audit, 3.5 Identification & Authentication.
Room 2: 3.2, 3.9, 3.10, 3.11, 3.12.
Room 3: 3.4, 3.7, 3.8.
Wednesday
Room 1: 3.6 Incident Response, 3.13 System & Communications Protection, 3.14 System & Information Integrity.
Rooms 2 and 3 continue their Tuesday families.
Thursday
Follow-ups in all rooms, final artifact request if required, then the out-brief.
Friday is held in reserve.
Expect homework every day. Assessors issue artifact requests at midday and at the end of each day. Being able to find any document in minutes is the most practical thing you can prepare.
7. Who needs to be available
DIBCAC asks for subject matter experts who can demonstrate implementation and answer questions for each security family. Write a real name next to each role, even if it is the same name several times.
| DIBCAC role | Related families (our mapping) | Who in your company? |
|---|
Roles are the list in DIBCAC Enclosure 1. If an outside IT or security provider runs part of your environment, add their contact as well; that line is our suggestion, not DIBCAC's.
8. Packaging and sending your proof
DIBCAC transfers files through DoD SAFE, a government file-exchange service approved for CUI and PII. It accepts up to 8 GB, and it deletes files after 7 days.
- Encrypt every file. The "Encrypt every file" box is required.
- Use a passphrase of at least 10 characters. Give it to the Assessment Lead by a different channel, such as a phone call or a separate email.
- Name files the DIBCAC way. High: requirement, objective, assessment number, company, date. Medium: assessment number, company, date.
High 3.1.20_a_22-XXX_CompanyName_20220325Medium 22-XXX_CompanyName_20220325 - Organize by family. One folder per family (3.1, 3.2, and so on), then zip the whole set into one file.
- Keep your own master copy. SAFE deletes after 7 days, and the examples in DIBCAC's package are dated 2022, so confirm the current naming with your Assessment Lead.
If you pursue CMMC Level 2 certification
Under 32 CFR 170.17(c)(4), your company keeps the hashed assessment artifacts for six years from the CMMC Status Date. You hash the artifact files with a NIST-approved algorithm and give the C3PAO a list of file names, hash values, and the algorithm used. Keep originals untouched so any later change is evident. Primary
9. The ten requirements companies fail most
DIBCAC's own data from 117 High assessments (2019 to 2022). These ten were among 883 total "Other Than Satisfied" findings.
| # | Requirement | Points | Share of companies with the finding | Proof expected | In plain English |
|---|
Pattern to notice. Most of these failures are not missing policies. They are missing proof that something happens regularly: reviews, scans, drills, alerts. Build a calendar and keep the records.
Source: DCMA DIBCAC, Top "Other Than Satisfied" Requirements from DIBCAC High Assessments (December 2022). The data covers 117 High assessments from 2019 to 2022 and 883 total findings; these ten account for 261 of them. Points and proof types match the self-assessment database. Primary
10. Two templates worth borrowing
DIBCAC's separate package for companies applying to become C3PAOs is not meant for ordinary contractors, but two of its templates are good models for any business.
Asset inventory, in five categories
| Category | Plain English | Example |
|---|---|---|
| CUI asset | Stores, processes, or sends CUI | Laptops used for contract work; cloud file storage |
| Security protection asset | Provides security functions for your scope, whether or not it touches CUI | Identity system, MFA app, firewall, a managed IT provider's staff |
| Contractor risk managed asset | Could touch CUI, but policy and practice keep it from doing so. It does not have to be separated from CUI assets. | A thumb drive that policy forbids using for CUI |
| Specialized asset | Government property, IoT, operational technology, restricted systems, test equipment | A networked CNC machine |
| Out of scope | Cannot touch CUI and is physically or logically separated from CUI assets | A separate phone system |
Each entry lists the category, asset, quantity, type, and a one-line description. The template is optional; a corporate inventory format is acceptable if it covers the same categories.
Inherited and not-applicable list
- Inherited: someone else does it for you, such as a cloud provider inside its own service. You still need their customer responsibility matrix as proof.
- Partially inherited: they handle some objectives and you handle the rest.
- Not applicable: it truly does not apply. Write a one-line reason. Example: "Wireless access is not permitted by policy."
11. A simple preparation plan
Appendix: all 110 requirements
Points, objective counts, and proof types come straight from DIBCAC's self-assessment database. Tick a requirement to mark it as not fully met and the estimate updates. This is a planning aid, not an SPRS submission, and it does not replace the DoD Assessment Methodology.
Proof key: D = Document, A = Artifact, S = Screen Share, P = Physical Review, A+S = both. "D×3, S×3" means three checkpoints need a document and three need a live demonstration.
Sources
- DoD CIO, Implementing Suspension of CMMC Phase II (July 2026). dodcio.defense.gov Primary
- DFARS 252.204-7021, Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements (NOV 2025): current CMMC status, annual affirmation in SPRS, status validity periods. Primary
- DFARS 252.204-7020, NIST SP 800-171 DoD Assessment Requirements (NOV 2023): access obligations, assessment definitions, SPRS posting, 14-business-day rebuttal, and subcontractor flow-down. Primary
- DoD, NIST SP 800-171 DoD Assessment Methodology, Version 1.2.1 (June 24, 2020), including the scoring table and sections 4 to 6. Landing page: acq.osd.mil Primary
- DCMA DIBCAC, Pre-Assessment Documents for High and Medium NIST SP 800-171 Assessments: Enclosure 1 (Action Items and Schedule), Enclosure 2 (CAGE/Contract Verification), Enclosure 3 (Assessment Logistics). dcma.mil Primary
- DCMA DIBCAC, Public High NIST SP 800-171 Self-Assessment Database, v1.1: points, special scoring notes, and proof type for each of the 320 objectives. dcma.mil Primary
- DCMA DIBCAC, Pre-Assessment Package for Prospective C3PAO Assessments: Planning Guide, Tab C (Inherited/N/A), Tab D (Asset Inventory). dcma.mil Primary
- 32 CFR 170.17, CMMC Level 2 certification assessment, including paragraph (c)(4) on artifact hashing and six-year retention. ecfr.gov Primary
- DCMA DIBCAC, Top "Other Than Satisfied" Requirements from DIBCAC High Assessments (December 2022). dcma.mil Primary
- NIST SP 800-171 Rev. 2 and SP 800-171A. csrc.nist.gov Primary
- Latham & Watkins, What Defense Contractors Should Know About DOD's Suspension of CMMC Phase 2 (July 30, 2026). lw.com Secondary
The DCMA documents reviewed here were downloaded from DCMA on November 4, 2026. The Enclosure 1 and 3 files and the C3PAO planning guide carry 2022 dates, and Enclosure 2 was last updated in February 2025. If DIBCAC sends you newer templates for your assessment, use those.
Run the assessment on your own machine
Axiometrik is desktop software for CMMC 2.0 Level 2 (NIST SP 800-171 Rev 2) and other frameworks: control testing, evidence, policy generation, attestation, and reviewer-ready deliverables, with no cloud account and no vendor copy of your data. The CMMC edition is in beta.